Main Garage


Car Shows


Finished Photos

Before & After


Progressive Photos

Existing Truck

Shop & Tools
Running Boards
Truck Bed
License Plate
Rear Shocks
Rear Brakes
Electrical Wiring
Gas Tank
Bench Seat
Glove Box

Radio
Dash
Heater
Gauges & Switches
Windshield Wipers
Cab Vents
Grill
Radiator
Hood
Headlights
Front Fenders
Doors

Cab

Steering Wheel

Transmission

Forward Controls

Engine

Fuel Pump

Drive Shaft

Exhaust

Starter

Carburetor

Brake Lines

Front End

Front Brakes

Rear End

Suspension

 

Frame

     Page 01

     Page 02

     Page 03

     Page 04

     Page 05

     Page 06

 

Cab Interior

Wheels

Oil Lines

Rear Fender

Rear Bumper

 

Estimated Cost & Parts List

 

DuPont Paints

 

Helpful Links

 

joey@joeysgarage.com

Top side of frame before blasting.

Top side of frame before blasting.

Top side of frame before blasting.

The frame has now been completely blasted and cleaned up.  Ready to prime.

 

In order to paint the frame the entire frame at one time, the frame has been completely suspended

Before priming.

Before priming.

Previous Page    -    Next Page